I've been very busy lately...
Photos are accumulated in tons...
several issues with our new home still under construction, as well as my sister in-laws one....
Their's had foundation cracks and ours cosmetics and some other crafstmanships issues...
Hopefully, I'll find some time to update photos and comments here soon...
Thursday, 17 June 2010
Sunday, 23 May 2010
electrical,Plumbing, HVCA, roofing,insulation
After the framer did a great job on our house, the rough in started and we can see mayor transformation "in" the house.
Electrical wiring started after the plumers have done the basement and upper floor's water and waste pipes rough-ins.
The HVCA came after and last the insulation.
Due to some building code changes, our house got hold at the pre-wall inspection: the inspection failed.
Sterling Homes did not provide the actualized blue-print design plan on a high wall that their engeenering has changed but did not sumit it to city of Calgary, therefore, when the inspector came the actual construction differed from his construction specs.
This and the garage's walls that are supporting the upper floor's rooms, excceded 3 meters and the material that we used are 2x4 insteate of 2x6.
and some other minor taht are conditionally acceptable.
All this had hold the construction to advance for one week+,
Electrical wiring started after the plumers have done the basement and upper floor's water and waste pipes rough-ins.
The HVCA came after and last the insulation.
Due to some building code changes, our house got hold at the pre-wall inspection: the inspection failed.
Sterling Homes did not provide the actualized blue-print design plan on a high wall that their engeenering has changed but did not sumit it to city of Calgary, therefore, when the inspector came the actual construction differed from his construction specs.
This and the garage's walls that are supporting the upper floor's rooms, excceded 3 meters and the material that we used are 2x4 insteate of 2x6.
and some other minor taht are conditionally acceptable.
All this had hold the construction to advance for one week+,
Tuesday, 18 May 2010
House framing almost completed
Monday, 17 May 2010
New home been framed
Back filling
Here you can see the earth being back filled.
It is good to prolong the back filling date from the concrete pourring.
The concrete needs certain time frame to cure. Information garthered from the net is that the best time is after 21 days. but ours was back filled about 10 days.![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEgdtUSBNo6F5OeP7HFGZO_rgq2J9-4HnDAkkGo1CQi2rtIo1M1wpu-ubFebb6gMN3k7JcCSov22xGBywHVHDWDI0u2Jc-5Xw_Af1U9eQcemTrkG33r1f5aGGqRfOBg6nEIB9im5ARrRdobd/s320/SDC11241.JPG)
Phtos taken on Mar. 11th 2010
From fundation to water proof and wiping tile (drainage of in ground water)
Now after the fundation is elected, the water proofing and prevention come in place.
After this point, the back-filling will be done.
Be careful about this stage.
Make sure that your wiping tile are well connected and it will do the job that it supposed to.
For this, you'll need to have some research on internet.
Mine, the subcontractor did not do a great job. The joins were not properlly set and I had to call in the site supervisor to chekc on it.
Do not "trust" on Builder's site supervisor checks. Due to the fact that they are human being and they are over worked with a lot of projects at once.
It is natural for home owner to take initiative to look after their new home. If you don't, surelly minor/mayor mistakes won't be catched by site's supervisor.
In the end, you'll be well spend time on your new home than they do.
Here in the right photo shows how the connecting T into the wall is not set properly!
I had to contact the site's supervisor to rectify this matter.
Photo taken on Mar. 2010
Friday, 14 May 2010
Fondation walls are up!
Things goes fast at this stage!
After ten days after purring the concret, the wall is up to uses!
We have a walk - UP basement, that is why you'll see that about half of the basement in the back is "free" from the surounding ground.
All photos taken on Feb 26th 2010
Right photo shows the piles that will support the garage concrete floor.
Photo left: main entrence
Right photo: view from the back house
Left photo: main basement
fondation walls
Here is our fondation wall being elected.
This is the view of the main entrence's retaining/windwall.
Here is the view form the back of the house. On the left is my brother in-law's house. Also a Berkshire but elevation A.
Footings
Saturday, 10 April 2010
Berkshire in Silverado elavation B: building our new house with SterlingHomes
Finally, our new home is under construction!! We would like to share with you our building experience!
The home model is a Berkshire-B by Sterling Homes group in Silverado, right at South of 22x. It is the southwest end of Calgary.
It has over CDN$60.000 of upgrades!!
I'll try to upload every detail that are available to me, so you could be part of this exciting experience as we do.
The Lot is facing west and
the back yard is facing an open green space (until
the land is developed into residential area). Fotos
taken in Sep. 28th 2009
![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEiX_IRwCrOFU4Rcl6EgBc0RfI5i-OEKKFdeEqGV-aiSVhITdgHK88Kj_n2b46IybLEaBIhq71bBfNx4BTq_lb87VljlTUs8OZPHEM5l7Xi8pb6OnIFrI96nQ4PJlmVp-7_hG_mnhZO_GOWd/s320/SDC10991.JPG)
The break ground took place on a cold day during this winter.
![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEg3MN7GM1ppiQ74bDTrzJGAusCL6kHIKq7eGLzg1xHRAp5AmQxmkfVqoxvU2XvAVCffoZ02gkYDxAbjW3_t_v1nlB_Cy8Njhs2T4uTgUUyxJrzYFp_YJAu8htyLZhE9FIgUDG8BUDavn57I/s320/DSC00877.JPG)
Me and my wife at front of the "house.
![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEhDHEPYAefXcV4r6136Cm-S00XYAJn5VVspT7w-mEst5ZrWlKw9fFFh0ZxSCyBk18SCDu1_y6s1mDVKFBq9QFWYWKMnmx0SpN7cZedcKnXN_-4cbfC_-ib653V6o3zajU0W3uBNNmcaVMZk/s320/DSC00881.JPG)
Looking toward the front of the "house"
Looking to the back yard of the "house".
Fotos taken in Fab. 14th 2010
As you noticed, the actual interests in bulding a new house started in fall 2009. It took quite long time to get into this point: The break ground date.
The home model is a Berkshire-B by Sterling Homes group in Silverado, right at South of 22x. It is the southwest end of Calgary.
It has over CDN$60.000 of upgrades!!
I'll try to upload every detail that are available to me, so you could be part of this exciting experience as we do.
the back yard is facing an open green space (until
the land is developed into residential area). Fotos
taken in Sep. 28th 2009
The break ground took place on a cold day during this winter.
Me and my wife at front of the "house.
Looking toward the front of the "house"
Fotos taken in Fab. 14th 2010
As you noticed, the actual interests in bulding a new house started in fall 2009. It took quite long time to get into this point: The break ground date.
Subscribe to:
Posts (Atom)